This project involves replacing the glazing at the PHL Airport on Terminals D, E, and DE Connector.
Collaborating with other teams, I translated the Revit model gathered from the on-site point information to AutoCAD. I was an integral part of the site survey and preparation of the backgrounds for various disciplines.
I contributed to the facade design process from the SD to the CD phase.
I led the production of CAD of existing and proposed drawings, which involved Plans, Elevations, Sections, Wall Sections, and Details.
I was an integral part of material research for various products and contributed to the feasibility studies and the VE process in collaboration with relevant vendors.
Area of site | 90,000 SF Glazing Area |
Date | 2023 |
Status of the project | Under Construction |
Tools used | Revit | AutoCAD | Sketchup |